Draft preview — not published. Phone and email are placeholders.

Services

Install, maintain and respond

Packaged pumping stations for sewage and surface water, planned maintenance contracts, tanker desilting and jetting, and emergency call-out day or night.

01 · New installs

Packaged pumping stations, designed for the site

We supply and install packaged foul and surface water pumping stations, above or below ground, from small domestic chambers to larger stations on housing and commercial developments. Rainwater harvesting chambers and booster sets can be included where the scheme needs them.

Typical packaged GRP stations are offered with chamber diameters from 0.8 to 2.9 metres and vertical depths from 1 to 6.5 metres. Horizontal chambers can be made to the length the site needs. Pump arrangements are single or twin, running as duty only, duty/assist or duty/standby.

  • Control panels built to order in the UK, in IP55 mild steel enclosures, with pear-type float controls or ultrasonics.
  • A high-level alarm, with volt-free contacts for remote signalling, is standard on all systems.
  • Access covers from pedestrian rating up to D400, to suit the location.
  • Pumps from established municipal manufacturers, in 230 V or 400 V, with galvanised or ductile iron pipework and sewage-rated valves.
  • Bespoke tanks can be delivered to site within 72 hours. A Fast-Trak fit-out is available within 48 hours if required; additional charges may apply.

Stations are designed in accordance with the relevant standards, including BS EN 12050-1 for pumping installations in buildings and sites, BS EN 12056-4 for drainage inside buildings, BS EN 752-6 for drain and sewer pumping stations outside buildings, and Approved Document H1 on foul drainage.

We can supply only, or handle mechanical and electrical installation and commissioning, including rising mains and dial-out telemetry. We also refurbish existing stations — including older brick chambers — where replacement of the whole package is not the right answer.

A newly installed twin packaged pumping station set into a plant-room floor, with two circular chambers, lifting chains and junction boxes.
A twin packaged station during installation. Duty and standby pumps sit in separate chambers, with lifting chains ready for service.
Two blue submersible pumps in a rectangular chamber, with float switches ranged along the wall and discharge pipework to one side.
Floats, discharge pipework and a twin-pump set — the parts that a planned visit is designed to inspect, clean and test.

02 · Service & maintenance

Planned contracts, not just a visit when it fails

We offer preventative maintenance contracts of 12, 24 or 36 months, with two or four visits a year, made up of a major service and a general service. Visits are arranged at a time that suits the site and completed within the agreed calendar month.

We maintain stations we installed and equipment from other manufacturers, regardless of make, design, age or condition. Service engineers are trained for confined-space working, including gas detection, breathing apparatus and confined-space entry procedures, and take regular refreshers.

Reports are filed online and are normally available within 24 hours. Contract customers can use their contract number to view scheduled visits, print reports and update contact information.

Small consumable items — for example level-control floats, control panel fuses and indicator bulbs, up to a value of £150 — can be replaced on the visit and invoiced separately. Anything larger is reported with a recommendation before work goes ahead.

What a major service includes

A 21-point mechanical and electrical check. The general service is a shorter version of the same inspection, without lifting and stripping the pumps unless something is wrong.

  1. Lift pump(s), clean the pump and check the data plate
  2. Check the pump volute for damage
  3. Check the impeller for debris and damage; unblock as required
  4. Check wear ring(s) for damage
  5. Assess motor and pump bearing condition
  6. Remove the oil drain plug and check the oil for water ingress, where appropriate
  7. Refit the drain plug with a new O-ring; refill or replace the oil where appropriate
  8. Check motor windings for continuity and insulation integrity
  9. Check motor cables for wear and water ingress
  10. Check and clean level-control floats or the ultrasonic head
  11. Check the condition and serviceability of the pump lifting system
  12. Check operation of isolation and non-return (reflux) valves
  13. Check the condition of wet-well pipework
  14. Check the wet well and valve chamber, including access covers
  15. Check the condition and serviceability of the pump control panel
  16. Check and adjust pump controls where necessary
  17. Check and test all safety and alarm facilities
  18. Check earth loop resistance
  19. Clean the control panel
  20. Check the condition of the control panel kiosk, where present
  21. Clean the chamber and remove items that could cause a blockage

03 · Breakdowns & emergency call-out

Engineers and tankers, day or night

When a station goes into high-level alarm, a pump trips, or sewage or surface water starts to back up, waiting until the next working day is rarely an option — particularly on a basement, a car park or a housing development.

Engineers and tankers are available 24 hours a day, 365 days a year, for domestic and commercial sites. Telephone support is available throughout the year, with a 24-hour engineer response. We prioritise overflowing stations, basement pump rooms and properties at immediate risk of flooding.

A typical emergency visit starts with making the site safe, pumping out the chamber if needed, clearing rag, fats and sediment, and getting at least one pump running. If a pump, float or panel has failed, we can often repair or replace it on the same attendance; if not, we will tell you clearly what has to happen next.

If a station is overflowing now: please telephone 01483 XXX XXX placeholder rather than sending the form. The number above is a placeholder on this draft and is not yet in service.
A corroded submersible pump lifted out of a chamber, with rag and fat caught on the handle and chain.
A pump lifted from a chamber, with rag and fat on the handle and chain — a common reason for a late-night call-out.
A pumping station chamber being emptied with an orange tanker hose, with a thick mat of fat and debris on the surface of the water.
Tanker hose in a chamber matted with fat and debris. Desilting and jetting take the load off the pumps and the level controls.

04 · Desilting & jetting

Clearing what the pumps cannot deal with

In normal operation, grease floats and forms a mat at the top of the chamber, and solids settle at the bottom. On many Surrey sites — housing developments, pubs and restaurants, schools, and older estates with long rising mains — that build-up is faster than people expect.

We provide tanker pump-outs and high-pressure jetting to desludge the chamber, clear fats, oils and grease (FOG), rags, wipes and sediment, and clean the pipework and equipment. This can be arranged as an emergency attendance or, more usefully, built into a service contract, typically once a year. Busier stations may need it more often.

A chamber that has not been desilted in years is one of the most common reasons a “serviced” station still goes into alarm a few weeks later. If you are taking on an inherited station, a tanker clean is often the right first step, before any conversation about repairs or a contract.

Request a quote

Tell us the town or postcode, what the station serves, and whether you need a new install, a contract, a one-off service or emergency attendance.